Miller Children’s Hospital & Central Plant

RF10 was contracted by CLEO CM for services including non-destructive testing for integrity checks, quality control consulting for compliance, inspection management to oversee regulatory adherence, and building inspection to verify the safety of the installed systems.
LOCATION
Long Beach, CA
STATUS
Complete
DATE
2009

The new inpatient pavilion was a four-story 125,000 sq. ft. project. The project included a dedicated pediatric surgery suite with seven operating rooms, pediatric imaging, a cardiac catheterization department with four catheterization labs, 24 neonatal intensive care beds and 24 general pediatric private patient rooms. In addition to the tower a new 5880 sq. ft. central plant was built to provide services to the new tower from an SPC-5 compliant building.

Some of the challenges encountered were the capping of oil wells and the installation of a methane barrier and monitoring system underneath the new structures. Inspections focused on structural integrity, code compliance, and identifying potential issues early. Through rigorous oversight and quality control, the project aimed to achieve a seamless, compliant, and timely completion of all construction stages.

PROJECTS

Ventura County Medical Center

LOCATION
Ventura, CA
STATUS
Ongoing

DATE
2028

Riverside Community Hospital

LOCATION
Riverside, CA
STATUS
Ongoing

DATE
2026

Martin Luther King, Jr. Community Hospital

LOCATION
Los Angeles, CA
STATUS
Complete

DATE
2014